Ongoing projects
27 projects in progress across 11 states and union territories, for pipeline operators and their EPC contractors.
| Project | Client / end client | Location | Size | Scope | Type |
|---|---|---|---|---|---|
| Kalamanga–Paradip iron ore slurry pipeline (Spread-2) | JSW Utkal Steel Ltd | Odisha | 32" × 129 km | TCP: design, supply, installation, testing and commissioning | Cross country pipeline |
| 26" slurry pipeline | Jindal Steel & Power Ltd (JSPL) | Odisha | 26" × 100 km (approx.) | TCP & PCP: design, supply, installation, testing, commissioning and post-commissioning survey | Cross country pipeline |
| North East Gas Grid (NEGG), Section-12 | Indradhanush Gas Grid Ltd / MECON Ltd | Tripura | 12" × 86 km | TCP: design and detailed engineering, supply, installation, testing and commissioning | Cross country pipeline |
| Srikakulam–Angul pipeline (Part-B), Section III | GAIL (India) Ltd / MECON Ltd | Odisha | 12" × 68.3 km | TCP: design and detailed engineering, supply, installation, testing and commissioning | Cross country pipeline |
| Visakh–Raipur pipeline project (Part-C) | HPCL / EIL | Chhattisgarh | 12" OD × 170.2 km | Cathodic protection works | Cross country pipeline |
| Natural gas pipeline infrastructure, APSEZ Mundra | Adani Total Gas Ltd | Mundra, Gujarat | 12" × 32.5 km and 8" × 3 km | TCP for city gas distribution pipeline | City gas distribution |
| Koyali–Ratlam pipeline AC interference mitigation (WRPL Koyali and Ratlam jurisdiction) | Indian Oil Corporation Ltd | Gujarat, Madhya Pradesh | 9 locations | AC interference mitigation | AC/DC mitigation |
| CP monitoring and maintenance, Ahmedabad GA | Adani Total Gas Ltd | Ahmedabad, Gujarat | 311.25 km | Monitoring and maintenance of PCP for laid 3LPE-coated steel pipeline | Monitoring & maintenance |
| CP monitoring and maintenance, Mahendragarh GA | Adani Total Gas Ltd | Mahendragarh, Haryana | 105.4 km | Monitoring and maintenance of PCP for laid 3LPE-coated steel pipeline | Monitoring & maintenance |
| CP monitoring and maintenance, Palwal GA | Adani Total Gas Ltd | Palwal, Haryana | 120 km | Monitoring and maintenance of PCP for laid 3LPE-coated steel pipeline | Monitoring & maintenance |
| Permanent CP, Bhilwara GA | Adani Total Gas Ltd | Bhilwara, Rajasthan | 50 km | PCP for laid 3LPE-coated steel pipeline | City gas distribution |
| Temporary CP, Palwal GA | Adani Total Gas Ltd | Palwal, Haryana | 38 km | TCP for laid 3LPE-coated steel pipeline | City gas distribution |
| Temporary CP, Mahendragarh GA | Adani Total Gas Ltd | Mahendragarh, Haryana | 7 km | TCP for laid 3LPE-coated steel pipeline | City gas distribution |
| UP–UK cluster steel pipeline PCP, Schedule 3 | Hindustan Petroleum Corporation Ltd | Uttar Pradesh, Uttarakhand | 198 km | Permanent cathodic protection for steel pipeline | City gas distribution |
| UP–UK cluster steel pipeline PCP, Schedule 4 | Hindustan Petroleum Corporation Ltd | Uttar Pradesh, Uttarakhand | 186 km | Permanent cathodic protection for steel pipeline | City gas distribution |
| UP–UK cluster steel pipeline PCP, Schedule 5 | Hindustan Petroleum Corporation Ltd | Uttar Pradesh, Uttarakhand | 116 km | Permanent cathodic protection for steel pipeline | City gas distribution |
| Underground steel pipelines PCP, Section 3 Saharanpur | Bharat Petroleum Corporation Ltd | Saharanpur, Uttar Pradesh | 48 km | PCP for CS 3LPE-coated underground steel pipelines | City gas distribution |
| MGL steel pipeline network CP monitoring (biennial contract) | Mahanagar Gas Ltd | Mumbai, Maharashtra | 691 km | Monitoring of cathodic protection system | Monitoring & maintenance |
| TCP services and CP system maintenance (biennial rate contract) | Mahanagar Gas Ltd | Mumbai, Maharashtra | —not stated | Temporary cathodic protection and CP system maintenance for steel pipeline | Monitoring & maintenance |
| AC and DC interference mitigation, GA1 (biennial contract) | Mahanagar Gas Ltd | Mumbai, Maharashtra | —not stated | Implementation of AC and DC interference mitigation | AC/DC mitigation |
| CP monitoring and maintenance of pipelines, Odisha region (two-year ARC) | GAIL (India) Ltd | Odisha | —not stated | Monitoring and maintenance of CP and associated systems of pipelines and installations | Monitoring & maintenance |
| Vadinar–Bina pipeline (VBPL) CP AMC | Bharat Petroleum Corporation Ltd | Gujarat, Madhya Pradesh | —not stated | Annual maintenance contract for CP monitoring and maintenance | Monitoring & maintenance |
| AC interference study, GSPL gas grid pipelines | Gujarat State Petronet Ltd | Gujarat | 250 km | AC interference study using modelling and simulation software | AC/DC mitigation |
| Raw water pipeline (RWPL) CP comprehensive AMC | HPCL Rajasthan Refinery Ltd | Rajasthan | 230 km | Comprehensive annual maintenance contract for the CP system | Monitoring & maintenance |
| CP works, Ankleshwar Asset (two years) | Oil and Natural Gas Corporation Ltd | Ankleshwar, Gujarat | —not stated | Cathodic protection works at different locations of the asset | Monitoring & maintenance |
| Zone-1 CP monitoring and maintenance: Ahmedabad Rural, Gandhinagar, Nadiad, Anand, Panchmahal and Dahod GAs | Gujarat Energy Ltd | Gujarat | 382 km | Rate contract for monitoring and maintenance of CP systems | Monitoring & maintenance |
| Zone-3 PCP works: Navsari, Valsad, DNH, Palghar and Thane Rural GAs | Gujarat Energy Ltd | Gujarat, Dadra and Nagar Haveli and Daman and Diu, Maharashtra | 80 km | Permanent cathodic protection system project works | City gas distribution |